Lamma Power Station Extension
- Summary Results on Water Quality Monitoring
Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at
C.W. Outfall No.3 Serving L9 Condensers
Weighted by Flowrates of Individual
Streams (October 2006)
|
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
|
15/10/2006 |
8.9 |
|
16/10/2006 |
9.0 |
|
17/10/2006 |
9.0 |
|
18/10/2006 |
8.6 |
|
19/10/2006 |
8.6 |
|
20/10/2006 |
8.6 |
|
21/10/2006 |
9.0 |
|
22/10/2006 |
8.7 |
|
23/10/2006 |
9.0 |
|
24/10/2006 |
9.0 |
|
25/10/2006 |
9.1 |
|
26/10/2006 |
9.0 |
|
27/10/2006 |
9.1 |
|
28/10/2006 |
9.1 |
|
29/10/2006 |
8.8 |
|
30/10/2006 |
9.2 |
|
31/10/2006 |
9.1 |
Total
Residual Chlorine Level at C.W. Outfall No. 3 (October 2006)
|
Date of sampling |
25/10 |
|
Total Residual Chlorine, mg/L |
0.25 |
Blowdown from Steam Turbine
and HRSG to C.W. Outfall No. 3 (October 2006)
|
Date of sampling |
October |
|
Suspended Solid, mg/L |
N/A* |
|
Grease & Oil, mg/L |
N/A* |
|
Temperature, Deg. Celsius |
N/A* |
|
Remark: |
|
|
1. *Measurement will be carried out
at least twice per year. |
|