Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

Weighted by Flowrates of Individual Streams (October 2006)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

15/10/2006

8.9

16/10/2006

9.0

17/10/2006

9.0

18/10/2006

8.6

19/10/2006

8.6

20/10/2006

8.6

21/10/2006

9.0

22/10/2006

8.7

23/10/2006

9.0

24/10/2006

9.0

25/10/2006

9.1

26/10/2006

9.0

27/10/2006

9.1

28/10/2006

9.1

29/10/2006

8.8

30/10/2006

9.2

31/10/2006

9.1

 

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (October 2006)

 

Date of sampling

25/10

Total Residual Chlorine, mg/L

0.25

 

 

Blowdown from Steam Turbine and HRSG to C.W. Outfall No. 3 (October 2006)

 

Date of sampling

October

Suspended Solid, mg/L

N/A*

Grease & Oil, mg/L

N/A*

Temperature, Deg. Celsius

N/A*

 

Remark:

 

 

1.   *Measurement will be carried out at least twice per year.