Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

Weighted by Flowrates of Individual Streams (December 2006)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

01/12/2006

8.3

02/12/2006

8.3

03/12/2006

8.4

04/12/2006

8.2

05/12/2006

8.2

06/12/2006

8.2

07/12/2006

8.8

08/12/2006

8.5

09/12/2006

N.A.*

10/12/2006

N.A.*

11/12/2006

8.3

12/12/2006

8.3

13/12/2006

8.3

14/12/2006

8.4

15/12/2006

8.3

16/12/2006

7.7

17/12/2006

8.2

18/12/2006

8.4

19/12/2006

8.5

20/12/2006

8.4

21/12/2006

8.5

22/12/2006

8.5

23/12/2006

8.5

24/12/2006

8.2

25/12/2006

8.6

26/12/2006

8.6

27/12/2006

8.6

28/12/2006

8.5

29/12/2006

8.5

30/12/2006

8.5

31/12/2006

8.1

 

Total Residual Chlorine Level at C.W. Outfall No. 3

 

Date of sampling

7/12/2006

21/12/2006

Total Residual Chlorine, mg/L

0.30

0.30

 

 

Note:

1. * Unit L9 was not on load.