Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

Weighted by Flowrates of Individual Streams (January 2007)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

01/01/2007

8.1

02/01/2007

8.5

03/01/2007

8.5

04/01/2007

8.5

05/01/2007

8.5

06/01/2007

8.5

07/01/2007

8.1

08/01/2007

8.5

09/01/2007

8.5

10/01/2007

8.6

11/01/2007

8.6

12/01/2007

N.A.*

13/01/2007

N.A.*

14/01/2007

N.A.*

15/01/2007

N.A.*

16/01/2007

N.A.*

17/01/2007

N.A.*

18/01/2007

N.A.*

19/01/2007

N.A.*

20/01/2007

N.A.*

21/01/2007

N.A.*

22/01/2007

N.A.*

23/01/2007

N.A.*

24/01/2007

N.A.*

25/01/2007

9.4

26/01/2007

8.6

27/01/2007

8.3

28/01/2007

7.8

29/01/2007

8.3

30/01/2007

7.8

31/01/2007

8.7

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (January 2007)

 

Date of sampling

03/01/2007

17/1/2007

26/1/2007

Total Residual Chlorine, mg/L

0.25

N.A.*

0.30

 

Blowdown from Unit L9 Steam Turbine and HRSG to C.W. Outfall No. 3 (January 2007)

 

Date of sampling

12/1/2007

12/1/2007

Source of Discharge

HSRG

Steam Turbine

Suspended Solid, mg/L

8

8

Grease & Oil, mg/L

<10

<10

Temperature, Deg. Celsius

32

34

 

 

Note:

1. * Unit L9 was not on load.