Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

Weighted by Flowrates of Individual Streams (February 2007)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

01/02/2007

8.8

02/02/2007

8.8

03/02/2007

8.4

04/02/2007

7.6

05/02/2007

8.8

06/02/2007

8.4

07/02/2007

8.9

08/02/2007

8.5

09/02/2007

8.5

10/02/2007

8.6

11/02/2007

7.2

12/02/2007

7.9

13/02/2007

9.0

14/02/2007

9.0

15/02/2007

8.0

16/02/2007

8.6

17/02/2007

N.A.*

18/02/2007

N.A.*

19/02/2007

N.A.*

20/02/2007

N.A.*

21/02/2007

8.5

22/02/2007

8.5

23/02/2007

8.6

24/02/2007

8.4

25/02/2007

8.8

26/02/2007

8.8

27/02/2007

8.7

28/02/2007

8.8

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (February 2007)

 

Date of sampling

02/02/2007

15/02/2007

Total Residual Chlorine, mg/L

0.25

0.30

 

 

Note:

1. * Unit L9 was not on load.