Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

Weighted by Flowrates of Individual Streams (March 2007)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

01/03/2007

8.3

02/03/2007

8.4

03/03/2007

7.5

04/03/2007

N.A.*

05/03/2007

8.5

06/03/2007

8.5

07/03/2007

8.5

08/03/2007

8.3

09/03/2007

8.3

10/03/2007

7.8

11/03/2007

6.3

12/03/2007

8.4

13/03/2007

8.4

14/03/2007

8.5

15/03/2007

8.5

16/03/2007

8.9

17/03/2007

N.A.*

18/03/2007

N.A.*

19/03/2007

7.3

20/03/2007

8.2

21/03/2007

8.2

22/03/2007

8.3

23/03/2007

8.4

24/03/2007

8.8

25/03/2007

7.8

26/03/2007

8.3

27/03/2007

8.3

28/03/2007

8.3

29/03/2007

7.9

30/03/2007

8.2

31/03/2007

7.3

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (March 2007)

 

Date of sampling

02/03/2007

15/03/2007

29/03/2007

Total Residual Chlorine, mg/L

0.25

0.25

0.30

 

Blowdown from Unit L9 Steam Turbine and HRSG to C.W. Outfall No. 3 (March 2007)

 

Date of Sampling

27/03/2007

27/03/2007

Source of Discharge

HSRG

Steam Turbine

Suspended Solid, mg/L

9

8

Grease & Oil, mg/L

<10

<10

Temperature, Deg. Celsius

30

31

 

Note:

1. * Unit L9 was not on load.