Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

Weighted by Flowrates of Individual Streams (April 2007)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

01/04/2007

8.3

02/04/2007

8.7

03/04/2007

8.3

04/04/2007

8.6

05/04/2007

N.A.*

06/04/2007

N.A.*

07/04/2007

8.6

08/04/2007

8.4

09/04/2007

8.3

10/04/2007

8.6

11/04/2007

8.7

12/04/2007

8.7

13/04/2007

8.6

14/04/2007

8.3

15/04/2007

8.2

16/04/2007

8.6

17/04/2007

8.6

18/04/2007

8.3

19/04/2007

8.2

20/04/2007

8.2

21/04/2007

8.2

22/04/2007

8.3

23/04/2007

8.4

24/04/2007

8.5

25/04/2007

8.3

26/04/2007

8.4

27/04/2007

8.8

28/04/2007

8.8

29/04/2007

8.8

30/04/2007

8.7

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (April 2007)

 

Date of sampling

12/04/2007

26/04/2007

Total Residual Chlorine, mg/L

0.30

0.30

 

 

Note:

1. * Unit L9 was not on load.