Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving Unit L9 Condensers

Weighted by Flowrates of Individual Streams (September 2007)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

01/09/2007

8.3

02/09/2007

8.3

03/09/2007

8.6

04/09/2007

8.4

05/09/2007

8.4

06/09/2007

8.4

07/09/2007

8.4

08/09/2007

8.5

09/09/2007

8.4

10/09/2007

8.5

11/09/2007

8.4

12/09/2007

8.4

13/09/2007

8.5

14/09/2007

8.4

15/09/2007

8.5

16/09/2007

7.7

17/09/2007

8.2

18/09/2007

8.2

19/09/2007

8.2

20/09/2007

8.2

21/09/2007

8.5

22/09/2007

8.3

23/09/2007

7.6

24/09/2007

8.6

25/09/2007

8.6

26/09/2007

7.7

27/09/2007

8.3

28/09/2007

8.5

29/09/2007

8.6

30/09/2007

8.6

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (September 2007)

 

Date of sampling

13/09/2007

28/09/2007

Total Residual Chlorine, mg/L

0.40

0.40

 

Blowdown from Unit L9 Steam Turbine and HRSG to C.W. Outfall No. 3 (September 2007)

 

Date of Sampling

24/09/2007

24/09/2007

Source of Discharge

HSRG

Steam Turbine

Suspended Solid, mg/L

10

11

Grease & Oil, mg/L

<10

<10

Temperature, Deg. Celsius

33

27