Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving Unit L9 Condensers

Weighted by Flowrates of Individual Streams (November 2007)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

01/11/2007

8.1

02/11/2007

8.1

03/11/2007

8.1

04/11/2007

8.1

05/11/2007

8.3

06/11/2007

8.1

07/11/2007

8.1

08/11/2007

8.0

09/11/2007

8.5

10/11/2007

7.9

11/11/2007

8.1

12/11/2007

8.1

13/11/2007

8.1

14/11/2007

8.1

15/11/2007

8.1

16/11/2007

8.1

17/11/2007

8.5

18/11/2007

8.0

19/11/2007

8.2

20/11/2007

8.2

21/11/2007

8.2

22/11/2007

8.2

23/11/2007

*

24/11/2007

*

25/11/2007

*

26/11/2007

8.5

27/11/2007

8.2

28/11/2007

8.2

29/11/2007

8.6

30/11/2007

8.2

 

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (November 2007)

 

Date of sampling

08/11/2007

21/11/2007

Total Residual Chlorine, mg/L

0.25

0.25

 

Note:

1. * Unit L9 was not on load.