Lamma Power Station Extension - Summary Results on Water
Quality Monitoring
Maximum Outlet Temperature Rise
(Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers
Weighted by Flowrates
of Individual Streams (January 2009)
|
Date |
Maximum
Outlet Temperature Rise (Deg.
Celsius) |
|
01/01/2009 |
8.5 |
|
02/01/2009 |
8.5 |
|
03/01/2009 |
8.3 |
|
04/01/2009 |
8.3 |
|
05/01/2009 |
8.5 |
|
06/01/2009 |
8.3 |
|
07/01/2009 |
8.6 |
|
08/01/2009 |
8.3 |
|
09/01/2009 |
8.5 |
|
10/01/2009 |
8.5 |
|
11/01/2009 |
8.5 |
|
12/01/2009 |
8.3 |
|
13/01/2009 |
8.3 |
|
14/01/2009 |
8.3 |
|
15/01/2009 |
8.3 |
|
16/01/2009 |
8.3 |
|
17/01/2009 |
8.3 |
|
18/01/2009 |
8.6 |
|
19/01/2009 |
8.6 |
|
20/01/2009 |
8.3 |
|
21/01/2009 |
8.6 |
|
22/01/2009 |
8.6 |
|
23/01/2009 |
8.3 |
|
24/01/2009 |
8.2 |
|
25/01/2009 |
8.5 |
|
26/01/2009 |
8.5
|
|
27/01/2009 |
8.5
|
|
28/01/2009 |
8.6
|
|
29/01/2009 |
8.3
|
|
30/01/2009 |
8.3
|
|
31/01/2009 |
* |
Total Residual Chlorine Level at
C.W. Outfall No. 3 (January 2009)
|
Date of sampling |
02/01/2009 |
15/01/2009 |
29/01/2009 |
|
Total
Residual Chlorine, mg/L |
0.42 |
0.40 |
0.42 |
Notes:
1. * Unit L9 was not on load.