Lamma Power Station Extension - Summary Results on Water
Quality Monitoring
Maximum Outlet Temperature Rise (Deg.
Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers
Weighted by Flowrates
of Individual Streams (February 2009)
|
Date |
Maximum
Outlet Temperature Rise (Deg.
Celsius) |
|
01/02/2009 |
* |
|
02/02/2009 |
8.7 |
|
03/02/2009 |
8.6 |
|
04/02/2009 |
8.6 |
|
05/02/2009 |
8.4 |
|
06/02/2009 |
8.6 |
|
07/02/2009 |
8.7 |
|
08/02/2009 |
8.7 |
|
09/02/2009 |
8.5 |
|
10/02/2009 |
8.5 |
|
11/02/2009 |
8.5 |
|
12/02/2009 |
8.8 |
|
13/02/2009 |
8.5 |
|
14/02/2009 |
8.5 |
|
15/02/2009 |
8.5 |
|
16/02/2009 |
8.6 |
|
17/02/2009 |
8.6 |
|
18/02/2009 |
8.6 |
|
19/02/2009 |
8.5 |
|
20/02/2009 |
8.4 |
|
21/02/2009 |
8.5 |
|
22/02/2009 |
8.4 |
|
23/02/2009 |
8.5 |
|
24/02/2009 |
8.4 |
|
25/02/2009 |
8.5 |
|
26/02/2009 |
8.4
|
|
27/02/2009 |
8.4
|
|
28/02/2009 |
8.3
|
Total Residual Chlorine Level at
C.W. Outfall No. 3 (February 2009)
|
Date of sampling |
12/02/2009 |
27/02/2009 |
|
Total
Residual Chlorine, mg/L |
0.42 |
0.40 |
Notes:
1. * Unit L9 was not on load.