Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (November 2009)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

01/11/2009

8.6

02/11/2009

8.6

03/11/2009

8.6

04/11/2009

8.6

05/11/2009

8.7

06/11/2009

8.7

07/11/2009

8.7

08/11/2009

8.4

09/11/2009

8.3

10/11/2009

8.7

11/11/2009

8.3

12/11/2009

8.7

13/11/2009

8.5

14/11/2009

8.1

15/11/2009

8.1

16/11/2009

8.0

17/11/2009

7.9

18/11/2009

8.1

19/11/2009

8.1

20/11/2009

8.1

21/11/2009

8.1

22/11/2009

8.1

23/11/2009

8.2

24/11/2009

8.1

25/11/2009

8.2

26/11/2009

8.1

27/11/2009

8.2

28/11/2009

*

29/11/2009

*

30/11/2009

8.6

 


Total Residual Chlorine Level at C.W. Outfall No. 3 (November 2009)

 

Date of sampling

04/11/2009

18/11/2009

Total Residual Chlorine, mg/L

0.40

0.40

 

Notes:

1. * Unit L9 was not on load.