Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

Weighted by Flowrates of Individual Streams (March 2010)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/3/2010

8.7

2/3/2010

8.7

3/3/2010

8.7

4/3/2010

8.7

5/3/2010

8.8

6/3/2010

8.8

7/3/2010

8.6

8/3/2010

8.6

9/3/2010

8.5

10/3/2010

8.6

11/3/2010

8.7

12/3/2010

8.6

13/3/2010

8.7

14/3/2010

8.7

15/3/2010

8.7

16/3/2010

8.9

17/3/2010

8.9

18/3/2010

8.9

19/3/2010

8.9

20/3/2010

8.9

21/3/2010

8.9

22/3/2010

9.0

23/3/2010

9.0

24/3/2010

9.1

25/3/2010

8.8

26/3/2010

8.9

27/3/2010

8.9

28/3/2010

9.0

29/3/2010

8.9

30/3/2010

8.8

31/3/2010

8.9

 


Total Residual Chlorine Level at C.W. Outfall No. 3 (March 2010)

 

Date of sampling

10/03/2010

24/03/2010

Total Residual Chlorine, mg/L

0.45

0.45

 

 

Blowdown from Unit L9 Steam Turbine and HRSG to C.W. Outfall No. 3 (March 2010)

 

Date of Discharge

30/03/2010

30/03/2010

Source of Discharge

HSRG

Steam Turbine

Suspended Solid, mg/L

11

12

Grease & Oil, mg/L

<10

<10

Temperature, Deg. Celsius

35

34