Lamma Power Station Extension - Summary Results on Water
Quality Monitoring
Maximum Outlet Temperature Rise (Deg.
Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers
Weighted by Flowrates
of Individual Streams (April 2011)
Date |
Maximum
Outlet Temperature Rise (Deg.
Celsius) |
1/4/2011 |
8.5 |
2/4/2011 |
8.6 |
3/4/2011 |
8.5 |
4/4/2011 |
8.4 |
5/4/2011 |
8.5 |
6/4/2011 |
8.5 |
7/4/2011 |
8.5 |
8/4/2011 |
8.6 |
9/4/2011 |
8.5 |
10/4/2011 |
8.6 |
11/4/2011 |
8.7 |
12/4/2011 |
8.6 |
13/4/2011 |
8.6 |
14/4/2011 |
8.6 |
15/4/2011 |
8.6 |
16/4/2011 |
8.6 |
17/4/2011 |
8.6 |
18/4/2011 |
8.5 |
19/4/2011 |
8.5 |
20/4/2011 |
8.5 |
21/4/2011 |
8.5 |
22/4/2011 |
8.5 |
23/4/2011 |
8.5 |
24/4/2011 |
8.5 |
25/4/2011 |
8.4 |
26/4/2011 |
8.5 |
27/4/2011 |
8.6 |
28/4/2011 |
8.7 |
29/4/2011 |
8.5 |
30/4/2011 |
8.5 |
Total Residual Chlorine Level at C.W. Outfall
No. 3 (April 2011)
Date of sampling |
07/04/2011 |
20/04/2011 |
Total Residual
Chlorine, mg/L |
0.40 |
0.45 |