Lamma Power Station Extension - Summary Results on Water
Quality Monitoring
Maximum Outlet Temperature Rise (Deg.
Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers
Weighted by Flowrates
of Individual Streams (September 2012)
|
Date |
Maximum
Outlet Temperature Rise (Deg.
Celsius) |
|
1/9/2012 |
8.4 |
|
2/9/2012 |
8.5 |
|
3/9/2012 |
8.4 |
|
4/9/2012 |
8.5 |
|
5/9/2012 |
8.5 |
|
6/9/2012 |
8.9 |
|
7/9/2012 |
8.3 |
|
8/9/2012 |
8.3 |
|
9/9/2012 |
8.3 |
|
10/9/2012 |
8.5 |
|
11/9/2012 |
8.5 |
|
12/9/2012 |
8.5 |
|
13/9/2012 |
8.5 |
|
14/9/2012 |
8.7 |
|
15/9/2012 |
* |
|
16/9/2012 |
8.3 |
|
17/9/2012 |
8.3 |
|
18/9/2012 |
8.3 |
|
19/9/2012 |
8.3 |
|
20/9/2012 |
8.7 |
|
21/9/2012 |
8.7 |
|
22/9/2012 |
8.8 |
|
23/9/2012 |
8.7 |
|
24/9/2012 |
8.8 |
|
25/9/2012 |
8.8 |
|
26/9/2012 |
8.7 |
|
27/9/2012 |
8.7 |
|
28/9/2012 |
8.9 |
|
29/9/2012 |
8.9 |
|
30/9/2012 |
8.7 |
* Unit L9 was not on load.
Total Residual Chlorine Level at C.W. Outfall
No. 3 (September 2012)
|
Date of sampling |
07/09/2012 |
21/09/2012 |
|
Total Residual
Chlorine, mg/L |
0.40 |
0.45 |
Blowdown from Unit L9 Steam Turbine and HRSG to C.W. Outfall No. 3 (September
2012)
|
Date of sampling |
07/09/2012 |
07/09/2012 |
|
Source of Discharge |
HSRG |
Steam Turbine |
|
Suspended Solid, mg/L |
11 |
11 |
|
Grease & Oil, mg/L |
<10 |
<10 |
|
Temperature, Deg. Celsius |
36 |
38 |