Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (December 2012)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/12/2012

8.8

2/12/2012

8.6

3/12/2012

8.7

4/12/2012

8.8

5/12/2012

8.7

6/12/2012

8.8

7/12/2012

8.8

8/12/2012

8.8

9/12/2012

8.9

10/12/2012

8.5

11/12/2012

8.5

12/12/2012

8.5

13/12/2012

8.5

14/12/2012

8.6

15/12/2012

8.7

16/12/2012

8.7

17/12/2012

8.6

18/12/2012

8.8

19/12/2012

8.7

20/12/2012

8.7

21/12/2012

8.9

22/12/2012

8.7

23/12/2012

8.7

24/12/2012

8.9

25/12/2012

8.9

26/12/2012

8.9

27/12/2012

8.9

28/12/2012

9.4

29/12/2012

8.7

30/12/2012

8.4

31/12/2012

8.4


 

Total Residual Chlorine Level at C.W. Outfall No. 3 (December 2012)

 

Date of sampling

14/12/2012

28/12/2012

Total Residual Chlorine, mg/L

0.40

0.40