Lamma Power Station Extension - Summary Results on Water
Quality Monitoring
Maximum Outlet Temperature Rise (Deg.
Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers
Weighted by Flowrates
of Individual Streams (February 2013)
|
Date |
Maximum
Outlet Temperature Rise (Deg.
Celsius) |
|
1/2/2013 |
* |
|
2/2/2013 |
* |
|
3/2/2013 |
* |
|
4/2/2013 |
* |
|
5/2/2013 |
* |
|
6/2/2013 |
6.3 |
|
7/2/2013 |
* |
|
8/2/2013 |
* |
|
9/2/2013 |
* |
|
10/2/2013 |
* |
|
11/2/2013 |
* |
|
12/2/2013 |
* |
|
13/2/2013 |
* |
|
14/2/2013 |
6.6 |
|
15/2/2013 |
8.3 |
|
16/2/2013 |
8.0 |
|
17/2/2013 |
8.0 |
|
18/2/2013 |
8.0 |
|
19/2/2013 |
8.0 |
|
20/2/2013 |
8.0 |
|
21/2/2013 |
8.0 |
|
22/2/2013 |
8.0 |
|
23/2/2013 |
8.1 |
|
24/2/2013 |
8.1 |
|
25/2/2013 |
8.1 |
|
26/2/2013 |
8.1 |
|
27/2/2013 |
8.1 |
|
28/2/2013 |
8.1 |
Note: * Unit L9 was not on
load.
Total Residual Chlorine Level at C.W. Outfall
No. 3 (February 2013)
|
Date of sampling |
18/02/2013 |
|
Total Residual
Chlorine, mg/L |
0.40 |
Note: Monitoring
was not carried out during overhaul of Unit L9.