Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (April 2013)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/4/2013

8.1

2/4/2013

8.1

3/4/2013

8.1

4/4/2013

8.1

5/4/2013

8.2

6/4/2013

8.1

7/4/2013

8.1

8/4/2013

8.1

9/4/2013

8.1

10/4/2013

8.1

11/4/2013

8.1

12/4/2013

8.1

13/4/2013

8.3

14/4/2013

8.3

15/4/2013

8.4

16/4/2013

8.5

17/4/2013

8.4

18/4/2013

8.6

19/4/2013

8.7

20/4/2013

8.5

21/4/2013

8.4

22/4/2013

8.4

23/4/2013

8.4

24/4/2013

8.5

25/4/2013

8.4

26/4/2013

8.3

27/4/2013

8.3

28/4/2013

8.3

29/4/2013

8.4

30/4/2013

8.4


 

Total Residual Chlorine Level at C.W. Outfall No. 3 (April 2013)

 

Date of sampling

05/04/2013

19/04/2013

Total Residual Chlorine, mg/L

0.40

0.40