Lamma Power
Station Extension - Summary Results on Water Quality Monitoring
Maximum Outlet Temperature Rise (Deg.
Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers
Weighted by Flowrates
of Individual Streams (December 2013)
Date |
Maximum
Outlet Temperature Rise (Deg.
Celsius) |
1/12/2013 |
8.9 |
2/12/2013 |
8.9 |
3/12/2013 |
9.0 |
4/12/2013 |
9.1 |
5/12/2013 |
9.1 |
6/12/2013 |
9.1 |
7/12/2013 |
9.1 |
8/12/2013 |
9.3 |
9/12/2013 |
9.4 |
10/12/2013 |
9.4 |
11/12/2013 |
9.1 |
12/12/2013 |
9.1 |
13/12/2013 |
9.0 |
14/12/2013 |
9.0 |
15/12/2013 |
9.0 |
16/12/2013 |
8.9 |
17/12/2013 |
8.9 |
18/12/2013 |
8.9 |
19/12/2013 |
8.9 |
20/12/2013 |
8.9 |
21/12/2013 |
8.9 |
22/12/2013 |
8.9 |
23/12/2013 |
9.0 |
24/12/2013 |
9.0 |
25/12/2013 |
9.0 |
26/12/2013 |
9.0 |
27/12/2013 |
9.0 |
28/12/2013 |
9.0 |
29/12/2013 |
8.9 |
30/12/2013 |
8.9 |
31/12/2013 |
8.9 |
Total Residual Chlorine Level at C.W. Outfall
No. 3 (December 2013)
Date of sampling |
13/12/2013 |
27/12/2013 |
Total Residual
Chlorine, mg/L |
0.40 |
0.45 |