Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (March 2015)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/3/2015

8.1

2/3/2015

8.0

3/3/2015

8.1

4/3/2015

8.1

5/3/2015

8.0

6/3/2015

8.1

7/3/2015

8.1

8/3/2015

8.1

9/3/2015

8.1

10/3/2015

8.1

11/3/2015

8.1

12/3/2015

8.1

13/3/2015

8.1

14/3/2015

8.1

15/3/2015

8.2

16/3/2015

8.2

17/3/2015

8.2

18/3/2015

8.2

19/3/2015

8.2

20/3/2015

8.2

21/3/2015

8.1

22/3/2015

8.1

23/3/2015

8.1

24/3/2015

8.1

25/3/2015

8.1

26/3/2015

8.1

27/3/2015

8.1

28/3/2015

8.1

29/3/2015

8.2

30/3/2015

8.3

31/3/2015

8.3


Total Residual Chlorine Level at C.W. Outfall No. 3 (March 2015)

 

Date of sampling

06/03/2015

20/03/2015

Total Residual Chlorine, mg/L

0.35

0.35

 

 

Blowdown from Unit L9 Steam Turbine and HRSG to C.W. Outfall No. 3 (March 2015)

 

Source of discharge

HSRG

Steam Turbine

Date of sampling

04/03/2015

04/03/2015

Suspended Solid, mg/L

11

11

Grease & Oil, mg/L

<10

<10

Temperature, Deg. Celsius

30

31