Lamma Power Station
Extension - Summary Results on Water Quality Monitoring
Maximum Outlet Temperature Rise (Deg. Celsius) of
Cooling Water at C.W. Outfall No.3 Serving L9 Condensers
Weighted by Flowrates of
Individual Streams (April 2015)
Date |
Maximum Outlet
Temperature Rise (Deg. Celsius) |
1/4/2015 |
7.5 |
2/4/2015 |
8.2 |
3/4/2015 |
8.2 |
4/4/2015 |
8.2 |
5/4/2015 |
8.2 |
6/4/2015 |
8.0 |
7/4/2015 |
8.1 |
8/4/2015 |
8.0 |
9/4/2015 |
8.0 |
10/4/2015 |
8.0 |
11/4/2015 |
8.0 |
12/4/2015 |
8.1 |
13/4/2015 |
8.1 |
14/4/2015 |
8.1 |
15/4/2015 |
8.1 |
16/4/2015 |
8.1 |
17/4/2015 |
8.0 |
18/4/2015 |
8.0 |
19/4/2015 |
8.0 |
20/4/2015 |
8.0 |
21/4/2015 |
8.0 |
22/4/2015 |
8.0 |
23/4/2015 |
8.0 |
24/4/2015 |
8.0 |
25/4/2015 |
8.0 |
26/4/2015 |
8.0 |
27/4/2015 |
8.0 |
28/4/2015 |
8.1 |
29/4/2015 |
8.2 |
30/4/2015 |
8.2 |
Total Residual
Chlorine Level at C.W. Outfall No. 3 (April 2015)
Date
of sampling |
01/04/2015 |
17/04/2015 |
30/04/2015 |
Total Residual Chlorine, mg/L |
0.40 |
0.35 |
0.35 |