Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (September 2015)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/9/2015

8.0

2/9/2015

8.0

3/9/2015

8.0

4/9/2015

8.1

5/9/2015

8.0

6/9/2015

8.0

7/9/2015

8.0

8/9/2015

8.0

9/9/2015

8.0

10/9/2015

*

11/9/2015

*

12/9/2015

*

13/9/2015

7.1

14/9/2015

8.0

15/9/2015

8.0

16/9/2015

8.0

17/9/2015

8.0

18/9/2015

8.2

19/9/2015

8.1

20/9/2015

8.1

21/9/2015

8.0

22/9/2015

8.1

23/9/2015

8.1

24/9/2015

8.1

25/9/2015

8.2

26/9/2015

8.2

27/9/2015

8.2

28/9/2015

8.1

29/9/2015

8.1

30/9/2015

8.2

Note:   * Unit L9 was not on load.


Total Residual Chlorine Level at C.W. Outfall No. 3 (September 2015)

 

Date of sampling

01/09/2015

18/09/2015

Total Residual Chlorine, mg/L

035

0.40