Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (June 2016)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/6/2016

8.3

2/6/2016

8.3

3/6/2016

8.3

4/6/2016

8.3

5/6/2016

8.3

6/6/2016

8.3

7/6/2016

8.3

8/6/2016

8.3

9/6/2016

8.3

10/6/2016

8.3

11/6/2016

8.2

12/6/2016

8.2

13/6/2016

8.3

14/6/2016

8.3

15/6/2016

8.3

16/6/2016

8.3

17/6/2016

8.4

18/6/2016

8.3

19/6/2016

8.4

20/6/2016

8.4

21/6/2016

8.3

22/6/2016

8.3

23/6/2016

8.3

24/6/2016

8.3

25/6/2016

8.3

26/6/2016

8.4

27/6/2016

8.4

28/6/2016

7.9

29/6/2016

7.9

30/6/2016

*

Note: * - Unit L9 was not on load.


Total Residual Chlorine Level at C.W. Outfall No. 3 (June 2016)

 

Date of sampling

10/06/2016

24/06/2016

Total Residual Chlorine, mg/L

0.35

0.40