Lamma Power Station Extension - Summary Results on Water
Quality Monitoring
Maximum Outlet Temperature Rise (Deg.
Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers
Weighted by Flowrates
of Individual Streams (July 2016)
Date |
Maximum
Outlet Temperature Rise (Deg.
Celsius) |
1/7/2016 |
* |
2/7/2016 |
* |
3/7/2016 |
* |
4/7/2016 |
* |
5/7/2016 |
7.7 |
6/7/2016 |
7.8 |
7/7/2016 |
7.8 |
8/7/2016 |
7.9 |
9/7/2016 |
7.8 |
10/7/2016 |
7.8 |
11/7/2016 |
7.8 |
12/7/2016 |
7.8 |
13/7/2016 |
7.8 |
14/7/2016 |
7.8 |
15/7/2016 |
7.9 |
16/7/2016 |
7.9 |
17/7/2016 |
* |
18/7/2016 |
7.8 |
19/7/2016 |
7.8 |
20/7/2016 |
7.8 |
21/7/2016 |
7.9 |
22/7/2016 |
7.9 |
23/7/2016 |
7.9 |
24/7/2016 |
7.9 |
25/7/2016 |
8.0 |
26/7/2016 |
8.0 |
27/7/2016 |
8.0 |
28/7/2016 |
8.0 |
29/7/2016 |
8.0 |
30/7/2016 |
8.0 |
31/7/2016 |
8.0 |
Note: * - Unit L9 was not on load.
Total Residual Chlorine Level at C.W. Outfall No. 3 (July 2016)
Date of sampling |
08/07/2016 |
23/07/2016 |
Total Residual
Chlorine, mg/L |
0.35 |
0.35 |