Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (March 2017)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/3/2017

7.9

2/3/2017

7.9

3/3/2017

7.9

4/3/2017

7.9

5/3/2017

7.9

6/3/2017

7.9

7/3/2017

7.9

8/3/2017

7.9

9/3/2017

7.9

10/3/2017

7.9

11/3/2017

8.0

12/3/2017

7.9

13/3/2017

8.0

14/3/2017

7.9

15/3/2017

7.9

16/3/2017

7.9

17/3/2017

7.9

18/3/2017

7.9

19/3/2017

7.9

20/3/2017

8.0

21/3/2017

8.0

22/3/2017

8.0

23/3/2017

8.0

24/3/2017

8.3

25/3/2017

8.0

26/3/2017

7.8

27/3/2017

8.0

28/3/2017

7.9

29/3/2017

7.9

30/3/2017

7.9

31/3/2017

7.9


Total Residual Chlorine Level at C.W. Outfall No. 3 (March 2017)

 

Date of sampling

03/03/2017

17/03/2017

31/03/2017

Total Residual Chlorine, mg/L

0.40

0.35

0.40

 

Blowdown from Unit L9 Steam Turbine and HRSG to C.W. Outfall No. 3 (March 2017)

 

Source of discharge

HSRG

Steam Turbine

Date of sampling

13/03/2017

13/03/2017

Suspended Solid, mg/L

16

17

Grease & Oil, mg/L

<10

<10

Temperature, Deg. Celsius

32

32