Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (July 2018)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/7/2018

*

2/7/2018

*

3/7/2018

7.8

4/7/2018

7.8

5/7/2018

7.8

6/7/2018

7.8

7/7/2018

7.9

8/7/2018

7.9

9/7/2018

7.9

10/7/2018

7.9

11/7/2018

7.9

12/7/2018

7.9

13/7/2018

7.9

14/7/2018

8.0

15/7/2018

7.9

16/7/2018

7.9

17/7/2018

8.0

18/7/2018

8.0

19/7/2018

8.0

20/7/2018

8.0

21/7/2018

8.0

22/7/2018

7.9

23/7/2018

8.0

24/7/2018

8.0

25/7/2018

8.0

26/7/2018

8.0

27/7/2018

8.1

28/7/2018

8.1

29/7/2018

8.0

30/7/2018

8.0

31/7/2018

8.0

Note: * - Unit L9 was not on load.

Total Residual Chlorine Level at C.W. Outfall No. 3 (July 2018)

 

Date of sampling

06/07/2018

20/07/2018

Total Residual Chlorine, mg/L

0.40

0.40