Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (December 2018)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/12/2018

8.3

2/12/2018

8.3

3/12/2018

8.3

4/12/2018

8.3

5/12/2018

8.3

6/12/2018

8.2

7/12/2018

8.1

8/12/2018

*

9/12/2018

8.0

10/12/2018

8.1

11/12/2018

8.1

12/12/2018

8.2

13/12/2018

8.2

14/12/2018

8.2

15/12/2018

8.3

16/12/2018

8.3

17/12/2018

8.3

18/12/2018

8.3

19/12/2018

8.3

20/12/2018

8.3

21/12/2018

8.3

22/12/2018

8.3

23/12/2018

8.3

24/12/2018

8.3

25/12/2018

8.4

26/12/2018

8.4

27/12/2018

8.4

28/12/2018

8.4

29/12/2018

8.3

30/12/2018

8.2

31/12/2018

8.2

Note: * Unit L9 was not on load.

Total Residual Chlorine Level at C.W. Outfall No. 3 (December 2018)

 

Date of sampling

07/12/2018

21/12/2018

Total Residual Chlorine, mg/L

0.40

0.40