Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (March 2019)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/3/2019

*

2/3/2019

*

3/3/2019

*

4/3/2019

*

5/3/2019

*

6/3/2019

*

7/3/2019

*

8/3/2019

*

9/3/2019

*

10/3/2019

*

11/3/2019

*

12/3/2019

*

13/3/2019

*

14/3/2019

*

15/3/2019

*

16/3/2019

*

17/3/2019

*

18/3/2019

7.5

19/3/2019

7.1

20/3/2019

8.5

21/3/2019

7.9

22/3/2019

7.9

23/3/2019

8.0

24/3/2019

8.1

25/3/2019

7.9

26/3/2019

8.1

27/3/2019

7.9

28/3/2019

7.9

29/3/2019

7.9

30/3/2019

8.0

31/3/2019

8.0

Note: Unit L9 was on load.

Total Residual Chlorine Level at C.W. Outfall No. 3 (March 2019)

 

Date of sampling

01/03/2019

16/3/2019

29/3/2019

Total Residual Chlorine, mg/L

*

*

0.35