Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 Condensers

 

Weighted by Flowrates of Individual Streams (April 2019)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/4/2019

7.8

2/4/2019

7.8

3/4/2019

7.9

4/4/2019

7.9

5/4/2019

7.9

6/4/2019

7.6

7/4/2019

5.3

8/4/2019

8.1

9/4/2019

7.9

10/4/2019

7.9

11/4/2019

7.9

12/4/2019

7.7

13/4/2019

7.3

14/4/2019

7.8

15/4/2019

7.8

16/4/2019

7.8

17/4/2019

7.8

18/4/2019

8.0

19/4/2019

*

20/4/2019

*

21/4/2019

*

22/4/2019

8.2

23/4/2019

8.2

24/4/2019

8.2

25/4/2019

8.2

26/4/2019

8.3

27/4/2019

8.2

28/4/2019

8.1

29/4/2019

8.2

30/4/2019

8.2

Note: Unit L9 was not on load.

Total Residual Chlorine Level at C.W. Outfall No. 3 (April 2019)

 

Date of sampling

12/04/2019

26/04/2019

Total Residual Chlorine, mg/L

0.40

0.35

 

Blowdown from Unit L9 Steam Turbine and HRSG to C.W. Outfall No. 3 (April 2019)

 

Source of discharge

HSRG

Steam Turbine

Date of sampling

18/04/2019

18/04/2019

Suspended Solid, mg/L

12

12

Grease & Oil, mg/L

<10

<10

Temperature, Deg. Celsius

30

31