Lamma Power Station
Extension - Summary Results on Water Quality Monitoring
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9 & L10
Condensers
Weighted by Flowrates of
Individual Streams (December 2021)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/12/2021 |
7.2 |
2/12/2021 |
7.2 |
3/12/2021 |
7.2 |
4/12/2021 |
7.2 |
5/12/2021 |
7.2 |
6/12/2021 |
7.3 |
7/12/2021 |
7.3 |
8/12/2021 |
7.2 |
9/12/2021 |
7.3 |
10/12/2021 |
7.4 |
11/12/2021 |
7.0 |
12/12/2021 |
7.2 |
13/12/2021 |
7.3 |
14/12/2021 |
7.4 |
15/12/2021 |
7.3 |
16/12/2021 |
7.3 |
17/12/2021 |
7.1 |
18/12/2021 |
7.3 |
19/12/2021 |
6.9 |
20/12/2021 |
7.2 |
21/12/2021 |
7.2 |
22/12/2021 |
7.8 |
23/12/2021 |
7.2 |
24/12/2021 |
7.3 |
25/12/2021 |
6.9 |
26/12/2021 |
6.7 |
27/12/2021 |
7.2 |
28/12/2021 |
7.2 |
29/12/2021 |
7.2 |
30/12/2021 |
7.2 |
31/12/2021 |
7.3 |
Total Residual Chlorine Level at C.W. Outfall No. 3
(December 2021)
Date of sampling |
01/12/2021 |
15/12/2021 |
31/12/2021 |
Total Residual Chlorine, mg/L |
0.40 |
0.30 |
0.30 |