Lamma Power Station
Extension - Summary Results on Water Quality Monitoring
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9, L10 &
L11 Condensers
Weighted by Flowrates of
Individual Streams (August 2022)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/8/2022 |
6.4 |
2/8/2022 |
6.8 |
3/8/2022 |
7.0 |
4/8/2022 |
7.0 |
5/8/2022 |
7.0 |
6/8/2022 |
7.0 |
7/8/2022 |
7.1 |
8/8/2022 |
7.1 |
9/8/2022 |
7.3 |
10/8/2022 |
7.1 |
11/8/2022 |
7.1 |
12/8/2022 |
7.2 |
13/8/2022 |
7.2 |
14/8/2022 |
7.2 |
15/8/2022 |
7.2 |
16/8/2022 |
7.4 |
17/8/2022 |
7.1 |
18/8/2022 |
7.1 |
19/8/2022 |
7.1 |
20/8/2022 |
7.2 |
21/8/2022 |
7.2 |
22/8/2022 |
7.2 |
23/8/2022 |
7.3 |
24/8/2022 |
7.2 |
25/8/2022 |
7.3 |
26/8/2022 |
7.2 |
27/8/2022 |
7.2 |
28/8/2022 |
7.2 |
29/8/2022 |
7.2 |
30/8/2022 |
7.0 |
31/8/2022 |
6.5 |
Total Residual Chlorine Level at C.W. Outfall No. 3
(August 2022)
Date of sampling |
12/08/2022 |
26/08/2022 |
Total Residual Chlorine, mg/L |
0.10 |
0.10 |