Lamma Power Station
Extension - Summary Results on Water Quality Monitoring
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9, L10 &
L11 Condensers
Weighted by Flowrates of
Individual Streams (April 2023)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/4/2023 |
5.8 |
2/4/2023 |
6.2 |
3/4/2023 |
6.2 |
4/4/2023 |
6.2 |
5/4/2023 |
6.2 |
6/4/2023 |
6.2 |
7/4/2023 |
6.2 |
8/4/2023 |
6.1 |
9/4/2023 |
6.0 |
10/4/2023 |
6.2 |
11/4/2023 |
5.9 |
12/4/2023 |
6.9 |
13/4/2023 |
6.1 |
14/4/2023 |
7.0 |
15/4/2023 |
5.4 |
16/4/2023 |
6.2 |
17/4/2023 |
6.2 |
18/4/2023 |
6.2 |
19/4/2023 |
6.3 |
20/4/2023 |
6.3 |
21/4/2023 |
6.3 |
22/4/2023 |
6.1 |
23/4/2023 |
6.2 |
24/4/2023 |
6.3 |
25/4/2023 |
6.3 |
26/4/2023 |
6.3 |
27/4/2023 |
6.3 |
28/4/2023 |
6.3 |
29/4/2023 |
6.1 |
30/4/2023 |
6.2 |
Total Residual Chlorine Level at C.W. Outfall No. 3
(April 2023)
Date of sampling |
12/04 |
26/04 |
Total Residual Chlorine, mg/L |
0.30 |
0.30 |