Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9, L10 & L11 Condensers

 

Weighted by Flowrates of Individual Streams (May 2023)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/5/2023

6.1

2/5/2023

6.2

3/5/2023

6.7

4/5/2023

6.8

5/5/2023

6.4

6/5/2023

6.4

7/5/2023

6.3

8/5/2023

6.2

9/5/2023

5.8

10/5/2023

5.7

11/5/2023

6.1

12/5/2023

6.0

13/5/2023

6.3

14/5/2023

5.9

15/5/2023

5.8

16/5/2023

6.1

17/5/2023

6.1

18/5/2023

6.2

19/5/2023

7.1

20/5/2023

7.1

21/5/2023

7.0

22/5/2023

7.1

23/5/2023

7.0

24/5/2023

7.0

25/5/2023

7.1

26/5/2023

6.9

27/5/2023

6.6

28/5/2023

7.1

29/5/2023

7.3

30/5/2023

6.8

31/5/2023

6.8

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (May 2023)

 

Date of sampling

12/05

24/05

Total Residual Chlorine, mg/L

0.30

0.40