Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9, L10 & L11 Condensers

 

Weighted by Flowrates of Individual Streams (January 2024)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/1/2024

4.1

2/1/2024

4.9

3/1/2024

5.4

4/1/2024

5.0

5/1/2024

5.1

6/1/2024

4.7

7/1/2024

5.4

8/1/2024

5.9

9/1/2024

5.7

10/1/2024

5.5

11/1/2024

5.4

12/1/2024

5.4

13/1/2024

5.6

14/1/2024

6.1

15/1/2024

5.1

16/1/2024

5.6

17/1/2024

5.6

18/1/2024

5.9

19/1/2024

5.1

20/1/2024

4.9

21/1/2024

5.9

22/1/2024

5.9

23/1/2024

5.5

24/1/2024

5.5

25/1/2024

5.5

26/1/2024

5.4

27/1/2024

6.1

28/1/2024

5.8

29/1/2024

4.2

30/1/2024

5.8

31/1/2024

5.5

 

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (January 2024)

 

Date of sampling

05/01

19/01

Total Residual Chlorine, mg/L

0.40

0.40