Lamma Power Station Extension - Summary Results on Water Quality Monitoring

 

Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9, L10 & L11 Condensers

 

Weighted by Flowrates of Individual Streams (February 2024)

 

Date

Maximum Outlet Temperature Rise

(Deg. Celsius)

1/2/2024

6.1

2/2/2024

6.1

3/2/2024

6.0

4/2/2024

5.9

5/2/2024

6.1

6/2/2024

6.1

7/2/2024

6.0

8/2/2024

6.0

9/2/2024

6.0

10/2/2024

5.9

11/2/2024

5.8

12/2/2024

5.7

13/2/2024

6.0

14/2/2024

6.1

15/2/2024

5.8

16/2/2024

5.5

17/2/2024

6.2

18/2/2024

5.2

19/2/2024

5.8

20/2/2024

5.8

21/2/2024

5.8

22/2/2024

5.9

23/2/2024

5.7

24/2/2024

6.2

25/2/2024

6.2

26/2/2024

6.4

27/2/2024

6.1

28/2/2024

6.0

29/2/2024

6.0

 

 

Total Residual Chlorine Level at C.W. Outfall No. 3 (February 2024)

 

Date of sampling

02/02

16/02

29/02

Total Residual Chlorine, mg/L

0.30

0.40

0.40