Lamma Power Station Extension - Summary Results on Water Quality
Monitoring
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9, L10 &
L11
Weighted by Flowrates of
Individual Streams (October 2024)
Date |
Maximum Outlet
Temperature Rise (Deg. Celsius) |
1/10/2024 |
5.7 |
2/10/2024 |
6.0 |
3/10/2024 |
5.9 |
4/10/2024 |
6.7 |
5/10/2024 |
6.9 |
6/10/2024 |
6.6 |
7/10/2024 |
6.7 |
8/10/2024 |
6.4 |
9/10/2024 |
6.5 |
10/10/2024 |
5.9 |
11/10/2024 |
6.0 |
12/10/2024 |
5.5 |
13/10/2024 |
5.8 |
14/10/2024 |
5.7 |
15/10/2024 |
5.9 |
16/10/2024 |
5.7 |
17/10/2024 |
5.6 |
18/10/2024 |
5.7 |
19/10/2024 |
5.9 |
20/10/2024 |
5.8 |
21/10/2024 |
5.7 |
22/10/2024 |
5.9 |
23/10/2024 |
5.7 |
24/10/2024 |
5.9 |
25/10/2024 |
6.3 |
26/10/2024 |
6.5 |
27/10/2024 |
5.9 |
28/10/2024 |
6.3 |
29/10/2024 |
5.8 |
30/10/2024 |
5.8 |
31/10/2024 |
5.8 |
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.4 Serving Unit L12
Weighted by
Flowrates of Individual Streams (October 2024)
Date |
Maximum Outlet
Temperature Rise (Deg. Celsius) |
1/10/2024 |
6.1 |
2/10/2024 |
6.0 |
3/10/2024 |
6.0 |
4/10/2024 |
6.6 |
5/10/2024 |
* |
6/10/2024 |
* |
7/10/2024 |
6.6 |
8/10/2024 |
* |
9/10/2024 |
* |
10/10/2024 |
6.2 |
11/10/2024 |
* |
12/10/2024 |
5.5 |
13/10/2024 |
5.7 |
14/10/2024 |
6.1 |
15/10/2024 |
6.0 |
16/10/2024 |
6.0 |
17/10/2024 |
5.9 |
18/10/2024 |
5.9 |
19/10/2024 |
6.1 |
20/10/2024 |
* |
21/10/2024 |
5.9 |
22/10/2024 |
6.2 |
23/10/2024 |
6.1 |
24/10/2024 |
6.5 |
25/10/2024 |
6.5 |
26/10/2024 |
6.6 |
27/10/2024 |
6.0 |
28/10/2024 |
6.5 |
29/10/2024 |
6.6 |
30/10/2024 |
6.5 |
31/10/2024 |
6.5 |
Note: * - Unit L12 was not on load.
Total Residual Chlorine Level at C.W. Outfall No. 3
(October 2024)
Date of sampling |
08/10 |
25/10 |
Total Residual Chlorine, mg/L |
0.40 |
0.40 |
Total Residual Chlorine Level at C.W. Outfall No. 4
(October 2024)
Date of sampling |
16/10 |
25/10 |
Total Residual Chlorine, mg/L |
0.40 |
0.40 |