Lamma Power Station
Extension - Summary Results on Water Quality Monitoring
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9, L10 &
L11
Weighted by Flowrates of
Individual Streams (December 2024)
Date |
Maximum Outlet
Temperature Rise (Deg. Celsius) |
1/12/2024 |
6.3 |
2/12/2024 |
6.0 |
3/12/2024 |
6.2 |
4/12/2024 |
6.2 |
5/12/2024 |
6.1 |
6/12/2024 |
6.1 |
7/12/2024 |
5.7 |
8/12/2024 |
5.8 |
9/12/2024 |
6.2 |
10/12/2024 |
6.4 |
11/12/2024 |
6.7 |
12/12/2024 |
6.4 |
13/12/2024 |
6.4 |
14/12/2024 |
6.1 |
15/12/2024 |
5.8 |
16/12/2024 |
6.1 |
17/12/2024 |
5.9 |
18/12/2024 |
6.0 |
19/12/2024 |
6.0 |
20/12/2024 |
6.1 |
21/12/2024 |
6.1 |
22/12/2024 |
5.8 |
23/12/2024 |
5.8 |
24/12/2024 |
6.2 |
25/12/2024 |
5.3 |
26/12/2024 |
5.7 |
27/12/2024 |
6.2 |
28/12/2024 |
5.8 |
29/12/2024 |
5.5 |
30/12/2024 |
5.8 |
31/12/2024 |
6.2 |
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.4 Serving Unit L12
Weighted by
Flowrates of Individual Streams (December 2024)
Date |
Maximum Outlet
Temperature Rise (Deg. Celsius) |
1/12/2024 |
* |
2/12/2024 |
6.2 |
3/12/2024 |
6.4 |
4/12/2024 |
6.4 |
5/12/2024 |
6.4 |
6/12/2024 |
6.1 |
7/12/2024 |
5.9 |
8/12/2024 |
* |
9/12/2024 |
* |
10/12/2024 |
* |
11/12/2024 |
* |
12/12/2024 |
* |
13/12/2024 |
* |
14/12/2024 |
* |
15/12/2024 |
* |
16/12/2024 |
* |
17/12/2024 |
* |
18/12/2024 |
* |
19/12/2024 |
* |
20/12/2024 |
* |
21/12/2024 |
* |
22/12/2024 |
* |
23/12/2024 |
* |
24/12/2024 |
* |
25/12/2024 |
* |
26/12/2024 |
* |
27/12/2024 |
* |
28/12/2024 |
* |
29/12/2024 |
* |
30/12/2024 |
* |
31/12/2024 |
* |
Note: * - Unit L12 was not on load.
Total Residual Chlorine Level at C.W. Outfall No. 3
(December 2024)
Date of sampling |
06/12 |
20/12 |
Total Residual Chlorine, mg/L |
0.40 |
0.40 |
Total Residual Chlorine Level at C.W. Outfall No. 4
(December 2024)
Date of sampling |
06/12 |
20/12 |
Total Residual Chlorine, mg/L |
0.40 |
* |
Note: * - Unit L12 was not on load.