Lamma Power Station
Extension - Summary Results on Water Quality Monitoring
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9, L10 &
L11 Condensers
Weighted by Flowrates of
Individual Streams (January 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/1/2025 |
5.5 |
2/1/2025 |
5.8 |
3/1/2025 |
5.8 |
4/1/2025 |
6.1 |
5/1/2025 |
5.7 |
6/1/2025 |
5.8 |
7/1/2025 |
5.9 |
8/1/2025 |
6.2 |
9/1/2025 |
6.4 |
10/1/2025 |
7.0 |
11/1/2025 |
7.0 |
12/1/2025 |
6.0 |
13/1/2025 |
6.0 |
14/1/2025 |
6.0 |
15/1/2025 |
6.0 |
16/1/2025 |
5.9 |
17/1/2025 |
6.0 |
18/1/2025 |
5.3 |
19/1/2025 |
4.9 |
20/1/2025 |
5.3 |
21/1/2025 |
5.6 |
22/1/2025 |
5.3 |
23/1/2025 |
5.3 |
24/1/2025 |
5.1 |
25/1/2025 |
5.9 |
26/1/2025 |
4.8 |
27/1/2025 |
5.3 |
28/1/2025 |
5.3 |
29/1/2025 |
4.8 |
30/1/2025 |
4.7 |
31/1/2025 |
4.8 |
Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W.
Outfall No.4 Serving Unit L12
Weighted by Flowrates of Individual Streams (January 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/1/2025 |
* |
2/1/2025 |
* |
3/1/2025 |
* |
4/1/2025 |
* |
5/1/2025 |
* |
6/1/2025 |
* |
7/1/2025 |
* |
8/1/2025 |
* |
9/1/2025 |
* |
10/1/2025 |
* |
11/1/2025 |
* |
12/1/2025 |
* |
13/1/2025 |
* |
14/1/2025 |
* |
15/1/2025 |
* |
16/1/2025 |
* |
17/1/2025 |
* |
18/1/2025 |
* |
19/1/2025 |
* |
20/1/2025 |
* |
21/1/2025 |
* |
22/1/2025 |
* |
23/1/2025 |
* |
24/1/2025 |
* |
25/1/2025 |
* |
26/1/2025 |
* |
27/1/2025 |
* |
28/1/2025 |
* |
29/1/2025 |
* |
30/1/2025 |
* |
31/1/2025 |
* |
Note: * - Unit L12
was not on load.
Total Residual Chlorine Level at C.W. Outfall No. 3 Serving
Units L9, L10 & L11 (January 2025)
Date of sampling |
03/01 |
17/01 |
28/01 |
Total Residual Chlorine, mg/L |
0.30 |
0.40 |
0.40 |
Total Residual Chlorine Level at C.W. Outfall No. 3 Serving
Units L12 (January 2025)
Date of sampling |
03/01 |
17/01 |
28/01 |
Total Residual Chlorine, mg/L |
* |
* |
* |
Note: * - Unit L12 was not on load.