Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/2/2025 |
5.5 |
2/2/2025 |
4.9 |
3/2/2025 |
5.2 |
4/2/2025 |
5.0 |
5/2/2025 |
5.1 |
6/2/2025 |
5.6 |
7/2/2025 |
5.7 |
8/2/2025 |
5.9 |
9/2/2025 |
5.4 |
10/2/2025 |
5.8 |
11/2/2025 |
5.7 |
12/2/2025 |
5.8 |
13/2/2025 |
5.8 |
14/2/2025 |
5.5 |
15/2/2025 |
6.0 |
16/2/2025 |
5.2 |
17/2/2025 |
5.7 |
18/2/2025 |
6.0 |
19/2/2025 |
4.9 |
20/2/2025 |
5.9 |
21/2/2025 |
6.1 |
22/2/2025 |
6.1 |
23/2/2025 |
6.1 |
24/2/2025 |
5.9 |
25/2/2025 |
5.8 |
26/2/2025 |
6.1 |
27/2/2025 |
6.1 |
28/2/2025 |
6.1 |
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.4 Serving L12
Condensers
Weighted by Flowrates of
Individual Streams (February 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/2/2025 |
* |
2/2/2025 |
* |
3/2/2025 |
* |
4/2/2025 |
* |
5/2/2025 |
* |
6/2/2025 |
* |
7/2/2025 |
* |
8/2/2025 |
* |
9/2/2025 |
* |
10/2/2025 |
* |
11/2/2025 |
* |
12/2/2025 |
* |
13/2/2025 |
* |
14/2/2025 |
* |
15/2/2025 |
* |
16/2/2025 |
* |
17/2/2025 |
* |
18/2/2025 |
* |
19/2/2025 |
7.1 |
20/2/2025 |
4.2 |
21/2/2025 |
* |
22/2/2025 |
* |
23/2/2025 |
* |
24/2/2025 |
5.1 |
25/2/2025 |
6.2 |
26/2/2025 |
6.1 |
27/2/2025 |
6.1 |
28/2/2025 |
6.3 |
Total Residual Chlorine Level at C.W. Outfall No. 3
(February 2025)
Date of sampling |
14/02 |
28/02 |
Total Residual Chlorine, mg/L |
0.30 |
0.20 |
Total Residual Chlorine Level at C.W. Outfall No. 4
(February 2025)
Date of sampling |
14/02 |
28/02 |
Total Residual Chlorine, mg/L |
* |
0.30 |