Lamma Power Station Extension - Summary
Results on Water Quality Monitoring
Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W.
Outfall No.3 Serving L9, L10 & L11 Condensers
Weighted by Flowrates of Individual Streams (April 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/4/2025 |
6.6 |
2/4/2025 |
6.6 |
3/4/2025 |
6.7 |
4/4/2025 |
6.2 |
5/4/2025 |
6.1 |
6/4/2025 |
5.5 |
7/4/2025 |
6.8 |
8/4/2025 |
7.1 |
9/4/2025 |
7.3 |
10/4/2025 |
6.8 |
11/4/2025 |
7.2 |
12/4/2025 |
6.9 |
13/4/2025 |
6.1 |
14/4/2025 |
6.9 |
15/4/2025 |
6.9 |
16/4/2025 |
6.9 |
17/4/2025 |
6.9 |
18/4/2025 |
6.2 |
19/4/2025 |
6.1 |
20/4/2025 |
6.0 |
21/4/2025 |
6.5 |
22/4/2025 |
6.9 |
23/4/2025 |
6.9 |
24/4/2025 |
6.9 |
25/4/2025 |
6.9 |
26/4/2025 |
6.2 |
27/4/2025 |
5.8 |
28/4/2025 |
7.1 |
29/4/2025 |
7.0 |
30/4/2025 |
6.7 |
Maximum Outlet Temperature Rise (Deg. Celsius)
of Cooling Water at C.W. Outfall No.4 Serving Unit L12
Weighted by Flowrates of Individual Streams (April 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/4/2025 |
6.1 |
2/4/2025 |
6.2 |
3/4/2025 |
6.5 |
4/4/2025 |
6.5 |
5/4/2025 |
6.4 |
6/4/2025 |
6.4 |
7/4/2025 |
6.5 |
8/4/2025 |
6.5 |
9/4/2025 |
6.5 |
10/4/2025 |
6.7 |
11/4/2025 |
6.7 |
12/4/2025 |
6.7 |
13/4/2025 |
6.7 |
14/4/2025 |
6.7 |
15/4/2025 |
6.8 |
16/4/2025 |
6.7 |
17/4/2025 |
6.7 |
18/4/2025 |
6.5 |
19/4/2025 |
6.5 |
20/4/2025 |
6.6 |
21/4/2025 |
6.7 |
22/4/2025 |
6.7 |
23/4/2025 |
6.7 |
24/4/2025 |
6.7 |
25/4/2025 |
6.7 |
26/4/2025 |
6.6 |
27/4/2025 |
6.6 |
28/4/2025 |
6.7 |
29/4/2025 |
6.6 |
30/4/2025 |
6.7 |
Note: * - Unit L12 was not on load.
Total
Residual Chlorine Level at C.W. Outfall No. 3 Serving Units L9, L10 & L11 (April
2025)
Date of sampling |
11/04 |
25/04 |
Total Residual Chlorine, mg/L |
0.20 |
0.30 |
Total
Residual Chlorine Level at C.W. Outfall No. 4 Serving Units L12 (April 2025)
Date of sampling |
11/04 |
25/04 |
Total Residual Chlorine, mg/L |
0.10 |
0.10 |