Lamma Power Station Extension - Summary Results on Water Quality
Monitoring
Maximum Outlet Temperature
Rise (Deg. Celsius) of Cooling Water at C.W. Outfall No.3 Serving L9, L10 &
L11 Condensers
Weighted by Flowrates of
Individual Streams (May 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/5/2025 |
6.6 |
2/5/2025 |
7.1 |
3/5/2025 |
6.8 |
4/5/2025 |
6.2 |
5/5/2025 |
6.4 |
6/5/2025 |
7.3 |
7/5/2025 |
7.3 |
8/5/2025 |
6.7 |
9/5/2025 |
7.2 |
10/5/2025 |
6.7 |
11/5/2025 |
6.1 |
12/5/2025 |
6.8 |
13/5/2025 |
7.2 |
14/5/2025 |
6.6 |
15/5/2025 |
6.9 |
16/5/2025 |
7.8 |
17/5/2025 |
8.2 |
18/5/2025 |
8.2 |
19/5/2025 |
7.7 |
20/5/2025 |
6.9 |
21/5/2025 |
6.3 |
22/5/2025 |
6.3 |
23/5/2025 |
7.1 |
24/5/2025 |
7.2 |
25/5/2025 |
6.5 |
26/5/2025 |
6.8 |
27/5/2025 |
6.3 |
28/5/2025 |
6.6 |
29/5/2025 |
6.2 |
30/5/2025 |
6.1 |
31/5/2025 |
6.1 |
Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W.
Outfall No.4 Serving Unit L12
Weighted by Flowrates of Individual Streams (May 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/5/2025 |
6.2 |
2/5/2025 |
6.7 |
3/5/2025 |
6.7 |
4/5/2025 |
6.7 |
5/5/2025 |
6.8 |
6/5/2025 |
6.8 |
7/5/2025 |
6.7 |
8/5/2025 |
6.7 |
9/5/2025 |
6.7 |
10/5/2025 |
6.7 |
11/5/2025 |
6.4 |
12/5/2025 |
6.7 |
13/5/2025 |
6.8 |
14/5/2025 |
6.8 |
15/5/2025 |
6.8 |
16/5/2025 |
6.8 |
17/5/2025 |
6.8 |
18/5/2025 |
6.8 |
19/5/2025 |
6.8 |
20/5/2025 |
6.7 |
21/5/2025 |
6.8 |
22/5/2025 |
6.8 |
23/5/2025 |
6.8 |
24/5/2025 |
6.7 |
25/5/2025 |
6.7 |
26/5/2025 |
6.7 |
27/5/2025 |
6.7 |
28/5/2025 |
6.7 |
29/5/2025 |
6.6 |
30/5/2025 |
6.2 |
31/5/2025 |
6.2 |
Total Residual Chlorine Level at C.W. Outfall No. 3
Serving Units L9, L10 & L11 (May 2025)
Date of sampling |
09/05 |
23/05 |
Total Residual Chlorine, mg/L |
0.40 |
0.10 |
Total Residual Chlorine Level at C.W. Outfall No. 4
Serving Units L12 (May 2025)
Date of sampling |
09/05 |
23/05 |
Total Residual Chlorine, mg/L |
0.10 |
0.10 |