Lamma Power Station Extension - Summary
Results on Water Quality Monitoring
Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W.
Outfall No.3 Serving L9, L10 & L11 Condensers
Weighted by Flowrates of Individual Streams (June 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/6/2025 |
6.2 |
2/6/2025 |
6.4 |
3/6/2025 |
6.4 |
4/6/2025 |
6.3 |
5/6/2025 |
6.5 |
6/6/2025 |
6.8 |
7/6/2025 |
6.1 |
8/6/2025 |
6.1 |
9/6/2025 |
6.3 |
10/6/2025 |
6.6 |
11/6/2025 |
6.5 |
12/6/2025 |
6.2 |
13/6/2025 |
6.4 |
14/6/2025 |
6.0 |
15/6/2025 |
5.9 |
16/6/2025 |
6.1 |
17/6/2025 |
6.8 |
18/6/2025 |
6.9 |
19/6/2025 |
6.9 |
20/6/2025 |
6.9 |
21/6/2025 |
6.8 |
22/6/2025 |
6.0 |
23/6/2025 |
6.9 |
24/6/2025 |
6.9 |
25/6/2025 |
6.6 |
26/6/2025 |
6.9 |
27/6/2025 |
6.9 |
28/6/2025 |
6.8 |
29/6/2025 |
6.2 |
30/6/2025 |
6.9 |
Maximum Outlet Temperature Rise (Deg. Celsius)
of Cooling Water at C.W. Outfall No.4 Serving Unit L12
Weighted by Flowrates of Individual Streams (June 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/6/2025 |
6.1 |
2/6/2025 |
6.8 |
3/6/2025 |
6.7 |
4/6/2025 |
6.6 |
5/6/2025 |
6.7 |
6/6/2025 |
6.7 |
7/6/2025 |
5.6 |
8/6/2025 |
6.0 |
9/6/2025 |
6.5 |
10/6/2025 |
6.8 |
11/6/2025 |
6.8 |
12/6/2025 |
6.6 |
13/6/2025 |
6.7 |
14/6/2025 |
6.4 |
15/6/2025 |
6.3 |
16/6/2025 |
6.8 |
17/6/2025 |
6.7 |
18/6/2025 |
6.8 |
19/6/2025 |
6.8 |
20/6/2025 |
6.7 |
21/6/2025 |
6.8 |
22/6/2025 |
6.5 |
23/6/2025 |
6.8 |
24/6/2025 |
6.8 |
25/6/2025 |
6.8 |
26/6/2025 |
6.8 |
27/6/2025 |
6.7 |
28/6/2025 |
6.7 |
29/6/2025 |
6.2 |
30/6/2025 |
6.7 |
Total
Residual Chlorine Level at C.W. Outfall No. 3 Serving Units L9, L10 & L11 (June
2025)
Date of sampling |
06/06 |
20/06 |
Total Residual Chlorine, mg/L |
0.40 |
0.20 |
Total
Residual Chlorine Level at C.W. Outfall No. 4 Serving Units L12 (June 2025)
Date of sampling |
06/06 |
20/06 |
Total Residual Chlorine, mg/L |
0.20 |
0.10 |