Lamma Power Station Extension - Summary
Results on Water Quality Monitoring
Maximum Outlet Temperature Rise (Deg. Celsius) of Cooling Water at C.W.
Outfall No.3 Serving L9, L10 & L11 Condensers
Weighted by Flowrates of Individual Streams (July 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/7/2025 |
6.4 |
2/7/2025 |
6.9 |
3/7/2025 |
6.7 |
4/7/2025 |
6.6 |
5/7/2025 |
7.0 |
6/7/2025 |
6.7 |
7/7/2025 |
7.1 |
8/7/2025 |
6.7 |
9/7/2025 |
6.8 |
10/7/2025 |
6.5 |
11/7/2025 |
6.7 |
12/7/2025 |
6.6 |
13/7/2025 |
6.5 |
14/7/2025 |
7.0 |
15/7/2025 |
6.7 |
16/7/2025 |
6.7 |
17/7/2025 |
6.7 |
18/7/2025 |
6.5 |
19/7/2025 |
6.5 |
20/7/2025 |
5.1 |
21/7/2025 |
5.7 |
22/7/2025 |
5.8 |
23/7/2025 |
5.9 |
24/7/2025 |
6.7 |
25/7/2025 |
6.6 |
26/7/2025 |
6.7 |
27/7/2025 |
7.3 |
28/7/2025 |
6.9 |
29/7/2025 |
6.8 |
30/7/2025 |
6.8 |
31/7/2025 |
6.9 |
Maximum Outlet Temperature Rise (Deg. Celsius)
of Cooling Water at C.W. Outfall No.4 Serving Unit L12
Weighted by Flowrates of Individual Streams (July 2025)
Date |
Maximum Outlet Temperature Rise (Deg. Celsius) |
1/7/2025 |
6.7 |
2/7/2025 |
6.8 |
3/7/2025 |
6.7 |
4/7/2025 |
6.7 |
5/7/2025 |
6.8 |
6/7/2025 |
6.7 |
7/7/2025 |
6.8 |
8/7/2025 |
6.8 |
9/7/2025 |
6.8 |
10/7/2025 |
6.8 |
11/7/2025 |
6.8 |
12/7/2025 |
6.8 |
13/7/2025 |
6.8 |
14/7/2025 |
6.8 |
15/7/2025 |
6.8 |
16/7/2025 |
6.8 |
17/7/2025 |
6.8 |
18/7/2025 |
6.7 |
19/7/2025 |
6.7 |
20/7/2025 |
5.7 |
21/7/2025 |
6.0 |
22/7/2025 |
6.1 |
23/7/2025 |
6.2 |
24/7/2025 |
6.8 |
25/7/2025 |
6.8 |
26/7/2025 |
6.8 |
27/7/2025 |
6.8 |
28/7/2025 |
6.8 |
29/7/2025 |
6.8 |
30/7/2025 |
6.8 |
31/7/2025 |
6.8 |
Total
Residual Chlorine Level at C.W. Outfall No. 3 Serving Units L9, L10 & L11
(July 2025)
Date of sampling |
04/07 |
18/07 |
Total Residual Chlorine, mg/L |
0.10 |
0.10 |
Total
Residual Chlorine Level at C.W. Outfall No. 4 Serving Units L12 (July 2025)
Date of sampling |
04/07 |
18/07 |
Total Residual Chlorine, mg/L |
0.10 |
0.10 |