Appendix B Amount of Dredged and Dumped Marine Sediment
Date Dredged Marine Mud Dumped Marine Mud
(bulk volume m3) (bulk volume m3)
1/10/2001 19,414   19,414  
2/10/2001 19,754   19,754  
3/10/2001 17,102   17,102  
4/10/2001 15,640   15,640  
5/10/2001 14,178   14,178  
6/10/2001 13,702   13,702  
7/10/2001 12,002   12,002  
8/10/2001 11,152   11,152  
9/10/2001 13,940   13,940  
10/10/2001 13,328   13,328  
11/10/2001 14,790   14,790  
12/10/2001 13,328   13,328  
13/10/2001 8,976   8,976  
14/10/2001 12,614   12,614  
15/10/2001 8,976   8,976  
16/10/2001 4,726   4,726  
17/10/2001 5,338   5,338  
18/10/2001 12,002   12,002  
19/10/2001 8,738   8,738  
20/10/2001 3,400   3,400  
21/10/2001 2,550   2,550  
22/10/2001 6,800   6,800  
23/10/2001 6,800   6,800  
24/10/2001 5,100   5,100  
25/10/2001 5,950   5,950  
26/10/2001 4,250   4,250  
27/10/2001 5,100   5,100  
28/10/2001 3,400   3,400  
29/10/2001 7,650   7,650  
30/10/2001 5,100   5,100  
31/10/2001 6,426   6,426  
Summary of Dredging Rate during this period
1. Condition no .3.3 of the varied Environmental Permit (EP-071/2000/B)
1.1 During the ebb tide, the maximum allowable dredging rate is 52,667 m3 per day.
1.2 During the flood tide, the maximum allowable dredging rate is 40,667 m3 per day.
2. Checking Actual Dredging Rates Against EP requirements
2.1 It is difficult to differentiate the dredging volumes during ebb and flood tides in a day.  Hence to facilitate checking the EP conditions, it is assumed that the whole operation day falls on flood tides and ebb tides.  The largest bulked volume of dredged marine muds in the reporting month is converted to the in-situ volume, which is then checked against the EP conditions.  This approach has been acceptable by EPD.  
2.2 During the reporting month, the largest quantity of dredged marine mud is 19,754 m3 (bulked volume) on 2nd October 2001.  Hence, the volume of dredged mud equals to (19,754/ 1.3) = 15,195 m3 (in in-situ volume) where 1.3 is a bulking factor.  This figure, 15,195 m3,  is lower than both allowable rates summarised in item 1 above.  Hence, it can be concluded that the contractor complied with the condition stipulated in the EP regarding the dredging rate.