APPENDIX D AIR QUALITY MONITORING RESULTS
Site: Lamma Power
Station Extension
Month: April 2002
24 hour TSP
Measurement:-
Date |
TSP concentration (mg/m3) |
Weather Information (From Hong Kong Observatory) |
|||||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
Tai Yuen Village (AM4) |
Mean Wind Speed (km/hr) |
Prevailing Wind Dir. (°) |
Mean R.H. (%) |
|
05/04/2002 |
91 |
26 |
25 |
33 |
22.3 |
190 |
79 |
11/04/2002 |
72 |
71 |
(2) |
36 |
26.5 |
360 |
80 |
13/04/2002 |
- |
- |
45 |
- |
17.3 |
070 |
73 |
17/04/2002 |
36 |
38 |
31 |
26 |
7.6 |
120 |
83 |
23/04/2002 |
19 |
26 |
20 |
28 |
11.8 |
090 |
81 |
29/04/2002 |
35 |
32 |
32 |
46 |
19.9 |
060 |
85 |
1 hour TSP Measurement:-
Date |
Time |
TSP concentration (mg/m3) |
||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
||
05/04/2002 |
15:00-15:59 |
37 |
33 |
31 |
16:00-16:59 |
30 |
21 |
19 |
|
17:00-17:59 |
25 |
25 |
20 |
|
11/04/2002 |
15:00-15:59 |
81 |
72 |
70 |
16:00-16:59 |
92 |
91 |
85 |
|
17:00-17:59 |
92 |
120 |
86 |
|
17/04/2002 |
15:00-15:59 |
24 |
44 |
27 |
16:00-16:59 |
17 |
25 |
31 |
|
17:00-17:59 |
73 |
69 |
44 |
|
23/04/2002 |
15:00-15:59 |
10 |
12 |
14 |
16:00-16:59 |
7 |
19 |
14 |
|
17:00-17:59 |
43 |
27 |
29 |
|
29/04/2002 |
15:00-15:59 |
30 |
31 |
32 |
16:00-16:59 |
52 |
34 |
32 |
|
17:00-17:59 |
35 |
34 |
33 |
Remark:
(1)
The monitoring stations, Reservoir, East Gate
& Ash Lagoon are located within Lamma Power Station.
(2)
Partisol TSP sampler at AM3 (Ash Lagoon) was
found defective during the collection of filter paper on 12/4/2002. The defect was rectified on the same
day. A make-up 24hr TSP sampling
for AM3 was carried out on 13/4/2002.
1-hr
TSP 24-hr
TSP
(mg/m3) (mg/m3)
Action Level 340 190
Limit Level 500 260
Calibration: Calibration
details are shown in appendix G.
Equipment used:
Location |
1-hr TSP |
24-hr TSP |
Reservoir and East Gate |
TEOM 1400a |
High Volume Air Sampler |
Ash Lagoon |
Partisol Model 2000 Sampler |
|
Tai Yuen Village |
- |
MINIVOL Portable Sampler |