APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: October 2002

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

02/10/2002

54

50

52

(2)

13.6

070

78

04/10/2002

-

-

-

50

24.3

070

82

08/10/2002

98

123

108

82

21.2

010

45

14/10/2002

33

33

39

44

26.5

070

77

20/10/2002

15

15

13

11

8.8

220

80

26/10/2002

48

48

47

51

23.3

080

78

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

02/10/2002

15:00-15:59

41

41

42

16:00-16:59

33

30

36

17:00-17:59

13

22

14

08/10/2002

15:00-15:59

107

112

90

16:00-16:59

104

199

116

17:00-17:59

111

109

132

14/10/2002

15:00-15:59

23

27

29

16:00-16:59

43

46

48

17:00-17:59

46

50

47

20/10/2002

15:00-15:59

11

16

12

16:00-16:59

24

0

8

17:00-17:59

25

13

13

26/10/2002

15:00-15:59

45

43

43

16:00-16:59

50

47

48

17:00-17:59

47

48

49

Remark:

(1)                 The monitoring stations, Reservoir, East Gate & Ash Lagoon are located within Lamma Power Station.

(2)                 MiniVol TSP sampler at AM4 (Tai Yuen Village) was found defective during the collection of filter paper on 3/10/2002.  The defect was rectified on the same day.  A make-up 24hr TSP sampling for AM4 was carried out on 4/10/2002.

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

Calibration:            Calibration details are shown in appendix F.

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler