APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: November 2002

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

01/11/2002

63

116

53

14

29.6

010

73

07/11/2002

87

78

88

(1)

9.2

020

64

09/11/2002

-

-

-

86

41.5

070

72

13/11/2002

62

56

67

68

6.7

090

78

19/11/2002

32

33

31

28

34.8

060

81

25/11/2002

103

99

87

82

28.7

360

63

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

01/11/2002

15:00-15:59

45

147

45

16:00-16:59

38

101

45

17:00-17:59

41

153

41

07/11/2002

15:00-15:59

83

84

79

16:00-16:59

91

88

81

17:00-17:59

106

71

100

13/11/2002

15:00-15:59

78

64

73

16:00-16:59

76

69

71

17:00-17:59

76

70

71

19/11/2002

15:00-15:59

34

31

35

16:00-16:59

39

33

42

17:00-17:59

38

46

40

25/11/2002

15:00-15:59

71

64

70

16:00-16:59

70

72

71

17:00-17:59

70

68

73

Remark:

(1)                 The monitoring stations, Reservoir, East Gate & Ash Lagoon are located within Lamma Power Station.

(2)                 MiniVol TSP sampler at AM4 (Tai Yuen Village) was found defective during the collection of filter paper on 8/11/2002.  The defect was rectified on the same day.  A make-up 24hr TSP sampling for AM4 was carried out on 9/11/2002.

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

Calibration:            Calibration details are shown in appendix F.

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler