APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: January 2003

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

06/01/2003

87

105

88

76

41.5

060

80

12/01/2003

89

86

91

93

15.5

010

62

18/01/2003

59

50

54

51

16.8

100

66

24/01/2003

106

101

89

100

44.2

070

79

30/01/2003

72

70

(2)

75

42.7

070

74

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

06/01/2003

15:00-15:59

72

80

62

16:00-16:59

52

77

46

17:00-17:59

47

59

43

12/01/2003

15:00-15:59

100

96

91

16:00-16:59

94

90

92

17:00-17:59

84

71

88

18/01/2003

15:00-15:59

39

35

39

16:00-16:59

67

75

61

17:00-17:59

52

51

54

24/01/2003

15:00-15:59

84

78

87

16:00-16:59

91

84

87

17:00-17:59

96

88

94

30/01/2003

15:00-15:59

73

68

71

16:00-16:59

69

65

70

17:00-17:59

80

68

75

Remark:

(1)                 The monitoring stations, Reservoir, East Gate & Ash Lagoon are located within Lamma Power Station.

(2)                 Partisol TSP sampler at AM3 (Ash Lagoon) was found defective during the collection of filter paper on 04/02/2003, the first working day after the Chinese New Year Holiday.  The defect was rectified on the same day.  As the next sampling is scheduled on 05/02/2003, no make-up sampling was performed.

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

Calibration:            Calibration details are shown in appendix F.

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler