APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: March 2003

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

01/03/2003

40

36

40

46

9.3

030

86

07/03/2003

83

94

(2)

57

27.0

010

67

11/03/2003

-

-

69

-

31.1

090

66

13/03/2003

46

40

38

47

24.7

060

80

19/03/2003

36

37

38

29

28.4

040

84

25/03/2003

46

42

43

43

19.7

040

83

31/03/2003

36

32

30

31

9.7

040

85

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

01/03/2003

15:00-15:59

21

23

18

16:00-16:59

34

43

23

17:00-17:59

37

42

30

07/03/2003

15:00-15:59

77

110

81

16:00-16:59

85

112

87

17:00-17:59

80

105

77

13/03/2003

15:00-15:59

51

49

51

16:00-16:59

55

51

54

17:00-17:59

45

43

52

19/03/2003

15:00-15:59

35

35

33

16:00-16:59

42

40

41

17:00-17:59

48

44

45

25/03/2003

15:00-15:59

40

43

40

16:00-16:59

53

53

51

17:00-17:59

48

48

50

31/03/2003

15:00-15:59

27

25

20

16:00-16:59

40

31

27

17:00-17:59

31

31

27

Remark:

(1)                 The monitoring stations, Reservoir, East Gate & Ash Lagoon are located within Lamma Power Station.

(2)                 Partisol TSP sampler at AM3 (Ash Lagoon) was found defective during the collection of filter paper on 10/03/2003. The defect was rectified on the same day.  A 24 hour TSP make-up sampling was performed on 11/03/2003.

 

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

 

Calibration:            Calibration details are shown in appendix F.

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler