APPENDIX D AIR QUALITY MONITORING RESULTS
Site: Lamma Power
Station Extension
Month: June 2003
24 hour TSP
Measurement:-
Date |
TSP concentration (mg/m3) |
Weather Information (From Hong Kong Observatory) |
|||||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
Tai Yuen Village (AM4) |
Mean Wind Speed (km/hr) |
Prevailing Wind Dir. (°) |
Mean R.H. (%) |
|
05/06/2003 |
59 |
53 |
53 |
56 |
11.7 |
100 |
78 |
11/06/2003 |
39 |
40 |
43 |
32 |
28.6 |
230 |
91 |
17/06/2003 |
65 |
69 |
73 |
63 |
13.4 |
020 |
68 |
23/06/2003 |
(2) |
21 |
17 |
18 |
18.8 |
190 |
79 |
25/06/2003 |
73 |
- |
- |
- |
29.0 |
200 |
77 |
29/06/2003 |
33 |
28 |
18 |
14 |
23.5 |
190 |
75 |
1 hour TSP Measurement:-
Date |
Time |
TSP concentration (mg/m3) |
||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
||
05/06/2003 |
15:00-15:59 |
58 |
48 |
60 |
16:00-16:59 |
68 |
59 |
69 |
|
17:00-17:59 |
68 |
61 |
67 |
|
11/06/2003 |
15:00-15:59 |
(3) |
10 |
13 |
16:00-16:59 |
(3) |
16 |
17 |
|
17:00-17:59 |
(3) |
16 |
8 |
|
12/06/2003 |
15:00-15:59 |
18 |
- |
- |
16:00-16:59 |
17 |
- |
- |
|
17:00-17:59 |
7 |
- |
- |
|
17/06/2003 |
15:00-15:59 |
90 |
100 |
97 |
16:00-16:59 |
95 |
105 |
96 |
|
17:00-17:59 |
86 |
70 |
83 |
|
23/06/2003 |
15:00-15:59 |
45 |
16 |
15 |
16:00-16:59 |
19 |
14 |
13 |
|
17:00-17:59 |
38 |
26 |
24 |
|
29/06/2003 |
15:00-15:59 |
10 |
24 |
14 |
16:00-16:59 |
39 |
18 |
13 |
|
17:00-17:59 |
20 |
12 |
16 |
Remark:
(1)
The monitoring stations, Reservoir, East Gate
& Ash Lagoon are located within Lamma Power Station.
(2)
24-hr TSP sampler at AM1 (Reservoir) was
found defective during the collection of filter paper on 24/6/2003. The
defective part was replaced on the same day. A make-up 24-hr TSP sampling for AM1 was carried out on
25/6/2003.
(3)
TEOM 1-hr TSP sampler at AM1 (Reservoir) tripped
on 11/6/2003. A make-up 1hr TSP
sampling for AM1 was carried out on 12/6/2003.
1-hr
TSP 24-hr
TSP
(mg/m3) (mg/m3)
Action Level 340 190
Limit Level 500 260
Calibration: Calibration
details are shown in appendix F.
Equipment used:
Location |
1-hr TSP |
24-hr TSP |
Reservoir and East Gate |
TEOM 1400a |
High Volume Air Sampler |
Ash Lagoon |
Partisol Model 2000 Sampler |
|
Tai Yuen Village |
- |
MINIVOL Portable Sampler |