APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: November 2003

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

02/11/2003 (2)

204

193

230

246

6.9

010

75

08/11/2003

21

20

20

11

30.1

040

92

14/11/2003

76

75

81

76

29.3

070

75

20/11/2003

31

32

37

38

13.4

070

92

26/11/2003

61

62

62

69

25.0

080

72

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

02/11/2003

15:00-15:59

238

264

235

16:00-16:59

285

289

232

17:00-17:59

272

276

297

08/11/2003

15:00-15:59

0

0

0

16:00-16:59

9

19

13

17:00-17:59

6

0

4

14/11/2003

15:00-15:59

70

68

76

16:00-16:59

71

73

67

17:00-17:59

66

57

67

20/11/2003

15:00-15:59

39

36

43

16:00-16:59

43

39

45

17:00-17:59

41

36

47

26/11/2003

15:00-15:59

87

81

70

16:00-16:59

72

82

66

17:00-17:59

74

68

77

 

Remark:

(1)                 The monitoring stations, Reservoir, East Gate & Ash Lagoon are located within Lamma Power Station.

(2)                 As the general APIs were high and no significant dusty site activity was carried out on 2/11/2003, it is considered that the high TSP recorded at various stations were not related to the site activities but owing to hazy weather.  Hence no further action is required.

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

Calibration:            Calibration details are shown in appendix F.

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler